
Airbag for the lower body, the next frontier in safety for motorcycle riders!
Airbag Jeans – next generation Safety!
After four long years in the making the next generation Airbag protection is here!
Protect the first vertebra of the spine with modern Airbag technology! It’s a game changer for safety!
AIRBAG SAFETY
The invisible Airbag covers the spinal column’s first bone, the tailbone! The Mo’cycle® Airbag jeans is a revolutionary piece of riding gear as spinal column injuries tend to become permanent. If the unthinkable accident happens, the airbag will inflate and protect the lower body, including thighs and coccyx. The Mo’cycle® Airbag jeans is a modern fashion-tech product where advanced technology and fashion comes together to deliver ‘safety first’.
COMFORT
Wearing the Mo’cycle® Airbag jeans, you won’t feel the airbag structure at all, as it’s flat, soft and flexible. So, it will not bother you or impact the riding – just make it safer! The jeans are comfortable and available in different styles, sizes and colors. All with a seamless riding experience in mind. This is your opportunity to be a pioneer and ride Airbag protected this summer! Get them for yourself, your family and loved ones.
$499 for Mo’cycle® Airbag jeans will only be valid until 31 March 2023, so join the community now, back this project and get the deal!
Research from Stanford University shows that airbags are 6X more effective when absorbing impact hits compared to regular foam protection. The Airbag Jeans are designed to cover the hip, tailbone and thighs in the event of an accident.
Airbag jeans blue: $499, save – $100. A good deal for a great purpose!
The blue denim fabric is CE level A approved, stretchy and comfortable.
One Airbag – Multiple Designs. You can swap to different styles and keep the same Airbag, as the Airbag fits all Mo’cycle® Jeans. You can also get a black pair, higher CE level or why not a new wash that suits your wardrobe? In our world, innovation, design and sustainability are important values. That’s why you can machine wash the Mo’cycle® Jeans by removing the Airbag. Maybe they even become your favorite pair in your wardrobe? No problem, just remove the airbag when you go out!
Independent Airbag Jeans review
Want an objective third party review of the Airbag Jeans? The founder of McGearHub.com, one of the world’s most recognized professional motorcycle-gear reviewers, recently put the jeans to the test. The full review is 20-30 minutes long, and answers all questions you might have from an independent source. Click the button below to read the full review:
Regular vs. Relaxed fit
Most people can wear the Relaxed fit while the Regular fit can become too tight if you have a bigger body structure.
The Regular fit is designed for an average built rider and has a slimmer fit to the body.
The Relaxed fit has more leg room and designed for larger built riders, or if you want a more baggy look.
Adventure riders If you want the Jeans to cover your high adventure boots then go for the Relaxed fit, it has the space you need.
Female riders Go for the Regular fit, especially the Blue Regular Airbag Jeans, the blue motorcycle denim is super stretchy and curves nicely around the body. It looks great and is super-comfy!
The mid-air inflation tests shows how fast the Airbag jeans and vest inflates before hitting the ground.
The Mo’cycle® Airbag Jeans also come with CE approved Micro-lock knee pads from industry-leading brand Knox. The removable pads are soft to touch and becomes hard at impact.
We’ve partnered with Helite, the leader in motorcycle airbag technology, to manufacture our airbags. In addition to that, we’ve also partnered with Armalith that produces the CE approved abrasion resistant denim that’s stronger and lighter compared to kevlar and steel, while feeling and looking like regular jeans.
Crash tested on the road
The Airbag Jeans have been crash tested with hired professionals in speeds up to 70 km/h (43 mph). In addition to that, our founder Moses accidentally tested the Airbag Jeans when he crashed his new bike in 100 km/h (60 mph). Hear him tell the story below!
How the Airbag is activated
The Airbag is activated if you are physically removed from the motorcycle, it works like a ‘dead-man’s-switch’. Don’t worry, the Airbag won’t deploy if you forget to disconnect the tether when walking off the bike (it needs a force of approximately 40 kg / 88 lbs to activate).
All riders The shorter you adjust the tether, the faster is the inflation.
Sport bike riders Adjust the tether quite short, be close to the bike.
Adventure riders Adjust the tether so you can stand up straight on the bike from time to time, if that is your riding style.
100% reusable – just replace the cartridge
Unlike many other airbag products, you can easily prepare your Airbag Jeans for another ride after deployment! Just wait for the jeans to self-deflate and replace the CO2 cartridge.
Two CO2 cartridges are included, activate the Airbag Jeans with one cartridge and check how it feels inflated, then re-load it with the second cartridge.
The Airbag Jeans have gone viral several times on social media, bringing in a total of 100+ million views. The jeans have also been featured on The Tonight Show with Jimmy Fallon, and also just recently The Drew Barrymore Show!
The Airbag Jeans are in production
Recently, the Airbag Jeans have moved on from its prototype stage into full-scale production. To date, we’ve manufactured a total of 200 jeans – more are on the way!
Water repellent & breathable design
The black Airbag Jeans can be worn in any climate, it’s water repellent, breathable and the denim is CE level AA approved.
Save $100 when choosing this perk, it may save you in a real life accident someday, minimize the risks, the Airbag Jeans are your back up.
Protect your heart with the Airbag Vest
The Airbag Vest is made to handle impact hits (both on the front and back), thanks to its built-in airbag and its integrated CE approved protective pad on the back. We’ve paid extra attention to the spinal column by designing the vest to stabilise the rider’s helmet upon inflation.
The Mo’cycle® Airbag Vest covers your chest area and many vital organs with the Airbag, this is a must have if you are thinking safety first. Save $200 and get the Airbag Vest for $499 during this launch!
Get the combo deal, Full-body Airbag protection! The SAFEST and BEST deal for you, save a whopping $400 by choosing this perk, the best we can offer!
The Airbag stabilises the helmet and reduces the risk of spinal injuries.
What’s in the box
Here’s what’s included in the box when you place your order! Everything needed is of course included with your delivery. Dressed for safety!
About Mo’cycle
Mo’cycle is a Swedish fashion-tech brand founded by Moses Shahrivar; an award winning clothing designer and motorcyclist. He has designed motorcycle jeans for 18 years and his first design was sold by the Harley Davidson stores in Sweden. Funded by the European Union as well as investors from the Swedish version of Shark Tank (Dragons’ Den), Moses and his team set out to create the safest motorcycle clothes in the world; without sacrificing neither style, comfort or the riding experience. The Airbag Collection combines Airbag-tech, Space-tech and Fashion-tech and is the first glimpse into the future of the brand.
Size charts
Wondering which size to choose? Then you’ve come to the right place! Below, you’ll find our size charts as well as information on how you measure yourself. If you have any questions about the airbag jeans or the sizing, please book a quick phone call via the button below.